Goede prijs.  online

details van de producten

Created with Pixso. Huis Created with Pixso. Producten Created with Pixso.
Dieselgeneratoren
Created with Pixso. 8kw Portable Diesel Generator Customizable three phase 220V 380v With Wheels And Handrails

8kw Portable Diesel Generator Customizable three phase 220V 380v With Wheels And Handrails

Merknaam: JIWEI
Modelnummer: JW-YMT
MOQ: 1
Prijs: Onderhandelbaar
Betalingsvoorwaarden: T/t
Gedetailleerde informatie
Plaats van herkomst:
CHINA
Certificering:
ce
Nominale spanning:
110V/220V/230V/380V/400V/440V,120 tot 440V
Frequentie:
50/60Hz
Snelheid:
3600 tpm, 3000/3600 tpm
Nominale stroom:
5A-30A
Nominale kracht:
8 kW
Uitgangstype:
AC enkelfase,DC,AC 3-fase,andere
Kleur:
Aanpasbaar
Motortype:
Dieselmotor met luchtkoeling, in ecu
Startsysteem:
Handmatig starten, op afstand starten, elektrisch starten
Functie:
Elektriciteitsvoorziening
Capaciteit van brandstoftank:
10-25L, volgens de eisen van de klant
Alternator Type:
Borstel de alternator met AVR of borstelloos met AVR, driefasige alternator
Product:
8KW draagbare dieselgenerator aanpasbare driefasige 220V 380V met wielen en leuningen
Markeren:

8kw portable diesel generator

,

customizable three phase diesel generator

,

diesel generator with wheels handrails

Productomschrijving

8kw Portable Diesel Generator Customizable three phase 220V 380v With Wheels And Handrails


Overview


Core Advantages of 3-10kW Small Diesel Generators

Good Economy: Low fuel consumption and low long-term operating costs.

Durable and Reliable: Simple structure, low failure rate, and long service life.

Strong Load Adaptability: Capable of short-term overload and compatible with equipment with high starting current.

Flexible Application Scenarios: Portable or fixed installation, suitable for emergency power supply, outdoor construction, etc.

Easy Fuel Storage: Low volatility, high ignition point, safe and long-term storage.


Specification


Model CA11000XE   CA13000XE
Rated frequency(Hz) 50 50
Rated voltage(V) 230/400 230/400
Rated power(KW) Single phase 7.2 Three phase 7.8 Single phase 8.0 Three phase 8.8
Number of phases Single phase/Three phase/Equal power Single phase/Three phase/Equal power
Size(mm) 750×515×640 780×585×705
Netweight(kg 128 160
Fuel tank capacity (L) 12.5/16 12.5/16
Noise(decibels @7m) 85 85
Engine model 195FE 1100FE
type Straight,single cylinder,air-cooled,four stroke
Cylinder diameter(mm) 95 100
Piston stroke(mm) 75 85
Displacement(ml) 532 667
Fuel consumption rate g/kw*h ≤285 ≤260
Rated speed (r/min) 3000 3000
Starting system 12Vstarter motor 12V starter motor
Insulation Class H H
Continuous working time(h) 8 8
Fuel grade Diesel:0"(summer),-10"(winter)
Oil grade SAE 10W30(CD grade or above)
Optional configuration ATS/remote control/digital control panel/wheels and handles

Picetures

8kw Portable Diesel Generator Customizable three phase 220V 380v With Wheels And Handrails 0

8kw Portable Diesel Generator Customizable three phase 220V 380v With Wheels And Handrails 1

8kw Portable Diesel Generator Customizable three phase 220V 380v With Wheels And Handrails 2

8kw Portable Diesel Generator Customizable three phase 220V 380v With Wheels And Handrails 3

8kw Portable Diesel Generator Customizable three phase 220V 380v With Wheels And Handrails 4

8kw Portable Diesel Generator Customizable three phase 220V 380v With Wheels And Handrails 5

8kw Portable Diesel Generator Customizable three phase 220V 380v With Wheels And Handrails 6

8kw Portable Diesel Generator Customizable three phase 220V 380v With Wheels And Handrails 7


FAQ


1.Q: What is your MOQ of this item?
A:1 Sets.

2.Q: What is the lead time?
A:7 working days after received the 30%T/T deposit.
3.Q: Is it all right to make customer's own brand name?
A:We can be your OEM manufacture with your authorization of brand.
4.Q: Where is your Loading Port?
A:Shanghai or others.
5.Q: What are your payment terms?
A:30% TT as deposit,70% TT before Shipment.
6.Q: What is your company's available production capacity?
A:100 Sets per month.
7.Q:What's the warranty time of diesel generators?
A:12 months or 1000 working hours, whichever comes first.