| Brand Name: | JIWEI |
| Model Number: | JW-WPG33/*1 |
| MOQ: | 1 |
| Price: | 2870USD |
| Payment Terms: | T/T |
| Gen-set specifications | |
|---|---|
| Model | JW-WPG33/*1 |
| Standby Rating kVA/kWe | 33/26 |
| Prime Rating kVA/kWe | 30/24 |
| Voltage V | 400/230 |
| Frequency Hz | 50 |
| Power Factor | 0.8(lagging) |
| No. of Phases | 3 |
| Sound@1m(dB·(A)) | Open≤105 dB(A); Silence ≤85 dB(A) |
| Ambient temp(℃) | -10~45 |
| Gen-set regulation class | ISO8528-5 G2 |
| Steady-state voltage deviation | ≤±2.5%;≤±5% |
| Transient voltage deviation (100%sudden power decrease/increase) | +25%;-20% |
| Steady-state frequency band | ≤1.5% |
| Transient frequency deviation from rated frequency (100%sudden power decrease/increase) | +12%;-10% |
| Fuel consumption@25%/ 50% / 75%(L/h) | 2.4/ 3.9/ 5.3 |
| Fuel consumption@100% / 110%(L/h) | 7.5/ 8.3 |
| Standard Features | |||
|---|---|---|---|
| ♦ Electronic governor | ♦DC12 Electric starter | ♦ WEICHAI WHC6120NC | |
| ♦ Closed water-cooled | ♦ IP23 | ♦H type insulation | |
| ♦ Air filter | ♦ Muffler | ♦ Circuit Breaker | |
| ♦Startingatteries | ♦ with connective wires | ♦ Radiator | |
| ♦Oil Drain Valve | ♦Forklift Groove | ♦Shock Absorber | |
| ♦ Color | Weichai blue (B,F)/beige canopy and black chassis (L) | ||
| ♦ Packaging | packing case(B,F) | ||
| Options | |||
|---|---|---|---|
| ◇Voltage380V/415V | ◇Voltage 440V/480V | ◇External fuel tank(1000L/1500L) | |
| ◇Auxiliary winding | ◇Automatic Transfer Switch | ◇Alternator heater | |
| ◇Engine Heater (water) | |||
| Genset Model | Prime Rating (kVA) | Length A(mm) | Width B(mm) | Height C(mm) | Wet Weight* (kg) | Standard Fuel tank Capacity (L) |
|---|---|---|---|---|---|---|
| JW-WPG33/B1 | 30 | 1500 | 805 | 1160 | 650 | / |
| JW-WPG33/F1 | 30 | 1500 | 805 | 1160 | 650 | 55 |
| JW-WPG33/L1 | 30 | 1900 | 720 | 1100 | 950 | 44 |
*: Include coolant and oil.
For detailed parameters, please consult me.
Our OEM Partners are from different brands. With our customized solutions consistently delivering satisfaction ,we have won an esteemed reputation.
A:1 Sets.
A:20-30 working days after received the 30%T/T deposit.
A:We can be your OEM manufacture with your authorization of brand.
A:Shanghai or others.
A:30% TT as deposit,70% TT before Shipment.
A:100 Sets per month.
A:12 months or 1000 working hours, whichever comes first.