| Brand Name: | JIWEI |
| Model Number: | JW-C1000 |
| MOQ: | 1 |
| Price: | Negotiable |
| Payment Terms: | T/T |
Common feature
| ENGINE SPECIFICATION | |
|---|---|
| Manufacturer /Model | CCEC KTA38-G2A |
| Air intake system | Turbo, Air/Water cooling |
| Fuel system | PT type fuel pump, EFC |
| Cylinder arrangement | 12 in “V" |
| Displacement | 37.8L |
| Bore and stroke | 159*159(mm) |
| Compression ratio | 14.5:1 |
| Rated speed | 1500rpm |
| Max. Standby power at rated speed | 895KW/1217HP |
| Governor type | Electronic |
| GENERATING SET DATA | |
|---|---|
| Related range of voltage setting | ≥±5% |
| Steady-state voltage deviation | ≤±1% |
| Transient voltage deviation (100 % sudden power decrease) | ≤+25% |
| Transient voltage deviation (sudden power increase) | ≤-20% |
| Voltage recovery time (100% sudden power decrease) | ≤6S |
| Voltage recovery time (sudden power increase) | ≤6S |
| Related range of frequency setting | 0-5% adjustable |
| Steady-state frequency band | ≤1.5% |
| Transient frequency deviation (100 % sudden power decrease) | ≤+12% |
| Transient frequency deviation (sudden power increase) | ≤-10% |
| Frequency recovery time (100 % sudden power decrease) | ≤5S |
| Frequency recovery time (sudden power increase) | ≤5S |
We have cooperation with worldwide famous brands. For more specification,please contact us.
![]()
![]()
![]()
![]()
![]()
![]()
![]()
Our OEM Partners
are from different brands. With our customized solutions consistently delivering satisfaction, we have won an esteemed reputation.
1.Q: What is your MOQ of this item?
A:1 Sets.
2.Q: What is the lead time?
A:30 working days after received the 30%T/T deposit.
3.Q: Is it all right to make customer's own brand name?
A:We can be your OEM manufacture with your authorization of brand.
4.Q: Where is your Loading Port?
A:Shanghai or others.
5.Q: What are your payment terms?
A:30% TT as deposit,70% TT before Shipment.
6.Q: What is your company's available production capacity?
A:100 Sets per month.
7.Q:What's the warranty time of diesel generators?
A:12 months or 1000 working hours, whichever comes first.